Ok so elsewhere it was suggested that I write a WIKI regarding this subject and so I have but I thought I would post it here first (just from a copyright point of view).
Here it is.....
The purpose of this Wiki is to give people a resource to stop carriers and Telstra Wholesale from abrogating it's responsibilities when repairing faults.
It is becoming commonplace for the technicians to stop work at the Luca box on the outside of the house and tell people they need a registered cabler to
fix the internal cabling and in the worst case scenario, charging an incorrect call out fee. This is in clear breech of the rules and even Telstra's own
documentation.
Telstra is obliged to repair the service (and I might add on reconnections where the full fee is being charged connect the service through) to the first
socket except where a network termination device is fitted. A Luca box is not a network termination device as it doesn't meet the requirements laid down
in the wiring rules and Telstra's own document commonly refered to as the A2A.
So what are these resources? well basically links to documents from which you can print the relevant pages along with the page numbers to get you to the
pertinent information. Then if the repairing tech says I have to stop here, you can at least show him the information to show that he is wrong. From there
it is up to youto persue it if he still refuses but at least you will have reference material when lodging the complaint.
So firstly what is an NTD (network termination device)? let's use the wiring rules for that, from AS/CA S009:2013....
3.1.67 Network Termination Device (NTD)
a device meeting the carrier’s requirements that is provided by the
carrier to establish a demarcation point between the carrier’s
telecommunications network and customer cabling or customer
equipment.
Note 1: An NTD is permanently marked at manufacture with the words
‘Network Termination Device’ or the letters ‘NTD’. Any device that is
not so marked is not an NTD.
This can be found on page 18 of the document found here....
http://www.commsalliance.com.au/__data/assets/pdf_file/0017/39203/S009_2013.pdf
The really important part of this is note 1 as a Luca box does not have the required markings so any technician who claims it is the network boundary is
either ignorant of the facts at best or lying at worst! Usually it is somewhere in the middle and they are just misinformed by management!
The network boundary point is the important thing here so if the Luca box (or any box not appropriately marked for that matter) isn't the boundary, where
is it?
On page 168 of that same document there are diagrams showing that it is the first socket and that is where the tech has to fix the service to!
I would suggest printing off both pages and having them to hand when the tech arrives. I would also suggest that you should find your building entry point,
that is the place where the cable comes into your home, and if possible take pictures, they may come in handy if you have to lodge a complaint. One thing it
is worth knowing is that the tech can't just fit an NTD and then say it is your problem, you have to agree to the fitting of an NTD as it shifts the
responsibility for maintaining the cable to the first socket and they can't force that on to you without your agreement.
There is the possibility that the tech may try to say that the wiring rules don't apply to the network but that basically means that he is accepting that the
box is situated within the network and is not the boundary, but how do we get around that? Well Telstra themselves have produced their own documents that say
the same and more. A document known as the A2A (Authorisation to Alter) which intended for registered cablers not employed by Telstra, contains the same information
as that we have already discussed. The A2A can be found here....
https://www.telstra.com.au/content/dam/tcom/personal/help/pdf-b/012882-alteration-of-telstra-facilities-in-homes-and-small-businesses.pdf
And the relevant information starts on page 14....
4.3.1 The network boundary
Where the Telstra lead-in cable is not connected to a customer MDF or a Telstra NTD, the network
boundary for each line supplied to a building will be the first TO (“first socket”) connected to that line after
the building entry point or, in some cases, an obsolete fixed wallphone or other, obsolete, hard-wired
telephone. The first TO will be the network boundary with the vast majority of single dwellings
throughout Australia. In such cases, Telstra accepts responsibility for installation and repair of a
standard Telstra telephone service up to, and including, the first TO.
And there in their own document Telstra accept responsibility to the first socket not the Luca box!
Later in the document there are the same references as in S009 along with the same diagrams.
Telstra have also published a guide to home cabling........
https://www.telstra.com.au/content/dam/tcom/personal/help/pdf-b/017153a00-complete-home-cabling-guide.pdf
Our interest starts on page 13
4.10.2 The network boundary
While telecommunications cablers will be familiar with the concept of the network boundary, developers,
builders, electricians and consumers may not. Put simply, the network boundary is the point in a
telecommunications system that is deemed to be the end of a carrier’s or carriage service provider’s
telecommunications network. Any cabling or equipment connected to the network that is outside the
boundary of that network is deemed to be customer cabling or customer equipment that is subject to
technical regulation by the ACMA (Australian Communications and Media Authority).
Then on page 70 it has the following...
6 PREMISES CONNECTION DEVICE (PCD)
6.1 Description
The premises connection device (PCD) facilitates the transition from outdoor (underground or aerial)
cabling to indoor cabling. No matter what wireline telecommunications network technology is used to
supply the telecommunications services, the lead-in cabling will be connected to a PCD at the external
wall of the building and will be interconnected to the indoor termination equipment via one or more indoor
“tie” cable(s). The PCD may or may not be the network boundary and may vary in form and function
depending on the telecommunications network technology used.
Typical PCDs are shown in Figure 51 and Figure 52.
Figue 51 shows a number of boxes one of which is the Luca box and has a note appended....
Notes:
1. The above devices are shown in relative size. These devices are not NTDs and do not require an earth. They
are installed by the carrier.
So the fact that a luca box is not an NTD is now confirmed along with an image to compare your installation with.
Figure 52 actually shows an NTD (two actually but only one of interest to most people).
So we have established that Telstra is (and accepts) reponsible to the first TO (socket) for any faults but there is one last issue we haven't covered. What if
the sockets are star wired! That is, what if more than one cable comes back to the luca box, which is the first socket? Well we can go back to the A2A for that
scenario. On Page 14 it states.....
Prior to “deregulation” of premises cabling in 1989, it was common practice in some areas to star wire TOs from a connection device or joint in the lead-in cable.
In such cases, each star-wired TO is potentially the network boundary for the cable terminated on it. In the deregulated environment, this creates problems for
both Telstra and the cabling provider, but Telstra is not obliged to reconfigure existing star-wired installations.
So there is a dilemma for Telstra and it is my understanding (and you are allowed to edit this if I am wrong) that the policy is that the technician only has to
get the service working to one of those sockets and the socket he gets working is at his discretion not the customers. So they still have to get your service working
they can't charge you for that service but you may subsequently have to pay a registered cabler to sort out the rest of the installation! Note, you may have problems
on subsequent visits if the registered cabler re establishes a star wired installation instead of sorting things out properly.
I believe that should be enough to argue the point with but as this is a wiki, future contributors are free to edit or add as needed.
Note that you can't edit things here but feel free to comment!